Vilion Commenced the BESS Installation for 5MWh Energy Storage Project at Guangdong
2024-07-28
On July 24, 2024, Vilion has commenced the equipment installation work for its 5MWh C&I energy storage project at the Huizhou Industrial Park, including the on-site installation of energy storage equipment, inspection and wiring of anti-backflow meters, and other related tasks. This marks a significant milestone for the project, transitioning smoothly from the infrastructure construction phase to the equipment installation and commissioning phase.



MORE NEWS
2026-10-08
Choosing the Right Energy Storage System for Your Devices: A Comprehensive Guide
2026-10-06
Harnessing the Future: Understanding Containerized Battery Energy Storage Systems
2026-10-04
The Synergy of Renewable Energy and Battery Energy Storage Systems: Unlocking a Sustainable Future
2026-10-02
Unlocking the Future: The Importance of High Power Battery Storage in Consumer Electronics
CONTACT US
Vilion (Shenzhen) New Energy Technology Co., Ltd
Add: Tower A, Building 1, Duocai Silicon Valley, No. 8 Juhe Road, Pingshan District, Shenzhen, China
Vilion Tech B. V.
Add: Fascinatio Boulevard 216 Unit 220, 3065WB Rotterdam
Vilion Tech (UK) Ltd
Add: Office 303B 10 Courtenay Rd., East Lane Business Park, Wembley, United Kingdom HA9 7ND
Copyright©2024 Vilion (Shenzhen) New Energy Technology Co., Ltd






















