100kW/215kWh
Industrial Park Peak-load Shifting Project in Guangdong
Delivery time: Nov, 2023
Delivered products: A 100kW/215kWh EnerArk2.0 integrated outdoor battery energy storage cabinet
Application: The ESS is operating with on-grid mode. It can help the industrial park earn arbitrage benefits from the TOU tariff by peak-load shifting.