1200kW/2007kWh
Delivery Date:Oct, 2025
Products:1200kW/2007kWh BESS + 1000kVA Transformer
Application:To enhance power supply reliability and support the transition to low-carbon energy at Geraldton Airport in Western Australia, this project integrates a BESS and transformer to help reduce operational costs while providing stable backup power for critical loads during grid fluctuations. Additionally, the system also supports the upgrade of the airport's electrical infrastructure, driving the airport toward a greener and more efficient energy operation model.